Contact us

Ubud

Jungle Flower Villas

Completed Project

Family villas with spacious private grounds,
unique design, and an on-site restaurant

Ubud
10

villas

от 6,5 bln IDR

About the Complex

Jungle Flower Villas

A villa complex in Ubud — the cultural and spiritual center of the island, known for its landmarks, natural beauty, and tranquil atmosphere

Jungle Flower Villas

When nature becomes part of the interior

One-Bedroom Villa

130 м²

Land area

87 м²

House area

2

Floors

Sold

Two-Bedroom Villa

200 м²

Land area

150 м²

House area

2

Floors

6.4 BLN IDR

Booking

reserve

Booking for Jungle Flower Villas
is now open!

You can stay at our villas
and experience all the benefits
the complex has to offer

Location

The complex is located in the heart of the island - in the Ubud area,
near rice terraces and major landmarks.

In-House
Property Management

Our in-house management company will handle all matters
related to your property and stay

L&B Management

Our in-house management company will handle all matters
related to your property and stay

Аренда байков

Трансфер

Долгосрочное хранение багажа

Яхтенные прогулки Iconic Voyages

Pool Flower Splash

Услуги прачечной

Индивидуальные туры по Бали

Floating breakfast in the pool

Организация частных и корпоративных событий

Связаться

LOYO & BONDAR — one of the leading developers in Bali with 15 years
of experience in construction and a focus on investment real estate.
We create large-scale infrastructure projects with high profitability, managing
the entire cycle — from design and construction to operation, resale,
and reinvestment

Download presentation
100 000+ m²

in progress and completed
real estate

12

residential complexes,
6 of them already completed

5

in-house factories:
windows, doors, furniture, stretch ceilings, sewing production

In-house property management company

About Us Video

How We Build Business in Bali

A podcast by the founders of LOYO & BONDAR

How to Build a Villa Without Walls?

Ready-to-move-in project in Ubud: Jungle Flower Villas

Reality vs Render

What has LOYO & BONDAR built? A review of U Villas

Our Construction

Here you can find up-to-date videos of the
construction process of our projects

October 2026

Melasti Arcade

Basement waterproofing completed (2 layers)
Formwork stripping of the 2nd floor slab completed
Backfilling of trenches (around foundation): 25%

October 2026

Ubud Dream

Excavation works for the apartments: 28%
Villa MEP (engineering systems): 93%
Villa partition walls: 97%
Villa roofing works: 94%
Villa finishing works: 26%

October 2026

Pandawa Hills

Partition walls erected
Plumbing rough-in completed
Roofing works completed

October 2026

Pandawa Dream

Block A
Formwork stripping of retaining walls completed
Formwork stripping of the elevator shaft completed
Formwork installation for the parking slab completed
Reinforcement cage installation for the slab: 95%
Slab concrete pouring: 90%

Block B
Excavation: 95%
Concrete blinding (lean concrete base): 95%
Foundation axis layout marking completed

October 2026

XO PANDAWA

Завершен